Project record
Four classrooms rebuilt, new roof, sanitation block and furniture for 380 students.
Sherpur
100% complete
The 1987 school building had a leaking roof, cracked floors and a single unusable toilet. Classes were regularly suspended during heavy rain.
Renovation covered structural repair, a new corrugated roof with insulation, rewiring, a six-unit sanitation block with separate facilities for girls, and new desks for all four classrooms.
Recorded progress
15 JAN15 Jan 2026
Approval received from the Directorate of Primary Education.
Recorded by Constituency office
28 FEB28 Feb 2026
Walls re-plastered and floors relaid in all four classrooms.
40% complete
Recorded by Constituency office
30 MAR30 Mar 2026
New insulated roof installed across the full building length.
70% complete
Recorded by Constituency office
22 MAY22 May 2026
Sanitation block and furniture delivered; building handed over before the new term.
100% complete
Recorded by Constituency office
Photographs recorded at each stage as a visual evidence trail.
Condition before work
Handover report
Completion · PDF · 1 KB · 22 May 2026
Renovation approval order
Approval · PDF · 1 KB · 15 Jan 2026
Placeholder documents. Internal or sensitive documents are never published here.
Status, progress, budget and completion-date changes are logged.
Repair or rebuild every primary school building rated unsafe, with usable separate sanitation for girls in each one.
InfrastructureSherpur
1.1 km covered drain to stop bazaar flooding and connect 210 shops to a proper outfall.
Social WelfareSherpur
Ward-level camps to enrol eligible residents missing from the social safety-net registers.
InfrastructureSherpur
1.8 km of village road rebuilt with concrete surfacing, roadside drainage and two culverts.